Lahore 5 Marla House Asking Prices: 11 October 2026 Snapshot
A same-date search bracket for selected 5 Marla ready-house asks across five Lahore markets, with test ads, wrong sizes and single-storey outliers separated.
Cash asking brackets visible on 11 October 2026. Build age, covered area, materials, furnishings, solar/gas and exact location vary, so these are not like-for-like valuations.
Society / project
Selected pocket
Property
Public asking range
Availability position
Bahria Town Lahore
Selected Sectors B, C, D and E
5 Marla Ready house
PKR 1 Crore 85 Lakh–2 Crore 80 Lakh
Multiple newly added or recently updated public asks visible when checked; re-confirm the exact house
Bahria Orchard Lahore
Phase 1 • Eastern Block
5 Marla Ready house
PKR 1 Crore 80 Lakh–2 Crore 40 Lakh
Selected recently added or updated Phase 1 Eastern asks visible; re-confirm the exact house
DHA Lahore Phase 9 Prism
Selected Phase 9 / 9 Town listings
5 Marla Ready house
PKR 2 Crore 45 Lakh–3 Crore 60 Lakh
Selected recent public asks visible when checked; exact houses may change
DHA Rahbar Lahore
DHA Phase 11 • selected Sector 2 and society-level listings
5 Marla Ready house
PKR 2 Crore 10 Lakh–3 Crore 50 Lakh
Multiple same-week public asks visible when checked; re-confirm the exact house
Khayaban-e-Amin Lahore
Selected L, N and society-level double-storey houses
5 Marla Ready house
PKR 1 Crore 50 Lakh–2 Crore 30 Lakh
Multiple recently added or updated double-storey public asks visible; re-confirm exact house
Buyer questions
Frequently asked questions.
Are these completed-sale prices?+
No. These are selected public asking brackets checked on 11 October 2026. A completed transaction can close above or below an ask.
Why is the spread wider than plot prices?+
A house combines land with covered area, build age, structure, finish, fixtures, solar or gas, maintenance and location. Those attributes were not consistently standardized in the listings.
Why was one DHA Phase 9 listing excluded?+
The PKR 1.20 Crore record was explicitly titled Test Ad, so FPN did not use it as genuine market evidence.
Are taxes and transfer costs included?+
No inclusion was established. Ask for a same-day transfer and tax sheet plus an inventory of fixtures before token or bayana.
01
What this snapshot compares
This update compares selected 5 Marla built-house asks, not plots, files or apartments. FPN used active listing pages and kept the named phases or pockets visible so a broad society label is not mistaken for one fixed price.
02
Important exclusions improve the comparison
DHA Phase 9's explicit test ad was removed. Bahria Orchard's older low outlier and a 5.7 Marla record were not used. Khayaban-e-Amin's 4.5 and 5.5 Marla records and PKR 80–90 Lakh single-storey houses were separated from the double-storey bracket.
03
A house ask is not a construction certificate
Terms such as brand new, owner built, luxury, furnished, approved area, gas available and prime location remain seller claims until structural condition, sanctioned plan, covered area, utilities, fixtures and transfer documents are independently checked.
04
Budget beyond the asking figure
Confirm buyer taxes, transfer fee, NDC, outstanding dues, utility or meter charges, included fixtures, solar equipment, repair work, dealer commission and legal or technical inspection. Do not pay a token against photographs alone.
05
Use the dated price knowledge
Ask the FPN assistant with the society, 5 Marla size and house property type. For a current exact-house quote, viewing and document verification, contact Friends Property Network on 0322-4222522.
Verification note
Checked 11 October 2026, 7:15 PM PKT. FPN reviewed current public asking evidence only. A listing does not prove ownership, continued availability, construction quality, covered area, fixtures, approvals, dues or a completed transaction. Seller and dealer details are not reproduced. Information may change after publication; always obtain the latest official document before acting.
Friends Property Network is not responsible for project delays, non-delivery, possession delays, escalation or developer-imposed charges, approval changes, investment loss or developer default. Conduct independent legal, financial and technical due diligence before investing.