01Aureum Mall & Residences overview
Aureum is presented as an approximately 16-kanal, G+12 mixed-use development near Bahria Town Lahore and the Ring Road connection. The planned mix combines commercial floors, food and lifestyle activity with studio, one-bed and two-bed apartments. Final floor allocation and specifications must be matched with the signed booking documents.
02Apartment prices and installment structure
The current brochure lists apartment rates from PKR 19,500 per sq.ft. for inner units and PKR 20,500 per sq.ft. for selected outer units. The advertised structure is 10% booking, 15% confirmation, 55 monthly installments and 20% on completion.
- 426 sq.ft. studio example: PKR 83.07 Lakh total and PKR 8.31 Lakh booking
- 622–658 sq.ft. one-bed apartment options
- 1,103–1,491 sq.ft. two-bed apartment options
- Request the exact unit, facing, floor and payable dates in writing
03Commercial inventory requires floor-wise comparison
Commercial rates and schedules differ by floor and category. Current material includes examples at PKR 23,500 and PKR 40,000 per sq.ft., with 55-month and 42-month structures respectively. A lower or higher rate cannot be compared fairly without checking floor, access, frontage, usable area and possession charges.
04Why the location may matter
Access toward the Bahria Town and Lahore Ring Road corridor can support cross-city connectivity toward Raiwind Road, Multan Road, Canal Road and southern Lahore. Investment performance, however, depends on completed access, construction delivery, occupancy, tenant demand and building management—not location claims alone.
05Who should consider Aureum—and what to verify
The project may suit buyers seeking a relatively compact apartment, installment-based entry or mixed-use commercial exposure. It is not suitable for anyone relying on guaranteed rent, immediate possession or an unverified resale promise.
- Verify land title, authority approvals and approved building plan
- Confirm the exact unit number, net/gross area and floor
- Read escalation, cancellation, transfer and refund clauses
- Check construction progress and written possession schedule
- Include utility, maintenance, tax and possession charges in the total cost
Verification notePrepared from the current Aureum project brochure, payment-plan material and FPN project-page research available on 29 July 2026. Inventory and prices require a fresh written quotation. Information may change after publication; always obtain the latest official document before acting.