Talk to an AdvisorAureum Mall & Residences
Bahria Town Lahore
Luxury apartments and commercial property on installment—positioned for direct connectivity with Lahore Ring Road.
Official-source and payment-arithmetic review updated 8 September 2026Aureum Mall prices and booking at a glance.
The current apartment schedule starts with a 426 sq.ft. studio priced at PKR 83.07 Lakh, including a PKR 8.31 Lakh booking amount. One-bed and two-bed options in the supplied brochure range from 622 to 1,491 sq.ft. Commercial examples use separate floor-dependent rates and must not be compared without checking the exact floor, frontage and category charges.
These are brochure figures, not guaranteed live inventory. Before paying, obtain a dated unit statement showing the unit number, floor, net and gross area, complete 100% schedule, taxes, transfer, utility, maintenance and possession charges.
Live, shop and grow in one destination.
Aureum Mall & Residences is presented as a modern mixed-use project combining residential apartments, retail, offices and lifestyle facilities. Current project material places it near Bahria Town Lahore with direct access toward the Lahore Ring Road corridor.
The development is marketed as approximately 16 kanal with a G+12 configuration. Commercial floors and a food court are planned below the residential component. Exact built form, floor allocation and final specifications must be confirmed in signed project documents.
Developer identity
The supplied project brochure identifies AlFalah Real Estate & Builders. Buyers should match that entity with the seller named in the booking form and receiving bank account.
Payment arithmetic
The displayed apartment and office examples reconcile to 100% across booking, confirmation, 55 monthly installments and completion. Some current shop figures do not; FPN has separated those examples instead of presenting an incomplete schedule as final.
Approval and delivery status
FPN has not displayed a project-specific authority approval/NOC or sanctioned G+12 plan. The official project site says possession is planned within two years, but that statement is not a completion certificate or a unit-specific contractual handover date. Verify both items in signed documents.
Aureum elevation and interior concept.
Locally hosted by Friends Property Network. Every image is labelled by type; request a fresh site visit and dated construction evidence for today’s position.


Aureum Mall & Residences
Bahria Town Ring Road SL-3 Interchange, Lahore
This FPN location guide is for orientation. Confirm the exact plot, access road and site boundary during a physical or live-video visit.
Watch the project briefing.
Only a matching video from the official @OurFPN channel is attached. If no verified match exists, no video is shown.
Apartment payment plan.
All figures are in Pakistani rupees and reproduced from the current seven-page project brochure.
| Category | Area | Rate / sq.ft. | Total price | 10% booking | 15% confirmation | Monthly ×55 | 20% completion |
|---|---|---|---|---|---|---|---|
| Studio Inner | 426 sq.ft. | PKR 19,500 | PKR 8,307,000 | PKR 830,700 | PKR 1,246,050 | PKR 83,070 | PKR 1,661,400 |
| 1 Bed Inner | 622 sq.ft. | PKR 19,500 | PKR 12,129,000 | PKR 1,212,900 | PKR 1,819,350 | PKR 121,290 | PKR 2,425,800 |
| 1 Bed Outer | 658 sq.ft. | PKR 20,500 | PKR 13,489,000 | PKR 1,348,900 | PKR 2,023,350 | PKR 134,890 | PKR 2,697,800 |
| 2 Bed Outer | 1,103 sq.ft. | PKR 20,500 | PKR 22,611,500 | PKR 2,261,150 | PKR 3,391,725 | PKR 226,115 | PKR 4,522,300 |
| 2 Bed Outer | 1,316 sq.ft. | PKR 20,500 | PKR 26,978,000 | PKR 2,697,800 | PKR 4,046,700 | PKR 269,780 | PKR 5,395,600 |
| 2 Bed Outer | 1,491 sq.ft. | PKR 20,500 | PKR 30,565,500 | PKR 3,056,550 | PKR 4,584,825 | PKR 305,655 | PKR 6,113,100 |
Offices and shop-plan verification.
Commercial rates and schedules vary by floor and category. Confirm the exact unit and complete payable total before paying.
Commercial offices — PKR 23,500 per sq.ft.
| Area | Rate / sq.ft. | Total price | 10% booking | 15% confirmation | Monthly ×55 | 20% completion |
|---|---|---|---|---|---|---|
| 620 sq.ft. | PKR 23,500 | PKR 14,570,000 | PKR 1,457,000 | PKR 2,185,500 | PKR 145,700 | PKR 2,914,000 |
| 640 sq.ft. | PKR 23,500 | PKR 15,040,000 | PKR 1,504,000 | PKR 2,256,000 | PKR 150,400 | PKR 3,008,000 |
| 856 sq.ft. | PKR 23,500 | PKR 20,116,000 | PKR 2,011,600 | PKR 3,017,400 | PKR 201,160 | PKR 4,023,200 |
| 1,100 sq.ft. | PKR 23,500 | PKR 25,850,000 | PKR 2,585,000 | PKR 3,877,500 | PKR 258,500 | PKR 5,170,000 |
172 sq.ft. shop example — what the published labels actually total
| Published component | Amount | Share of PKR 77.40 Lakh | FPN finding |
|---|---|---|---|
| 10% down payment | PKR 774,000 | 10% | Clearly labelled |
| 15% confirmation | PKR 1,161,000 | 15% | Clearly labelled |
| 42 monthly installments | PKR 77,400 × 42 = PKR 3,250,800 | 42% | Arithmetic reconciles |
| 20% completion | PKR 1,548,000 | 20% | Clearly labelled |
| Labelled subtotal | PKR 6,733,800 | 87% | PKR 1,006,200 (13%) remains |
| Half-yearly payment | PKR 414,266 per published occurrence | Count not stated | Cannot complete a reliable 100% schedule |
478 sq.ft. second-floor shop — published figures total about 136%
| Published component | Amount | Share of PKR 19,120,000 | FPN finding |
|---|---|---|---|
| 10% down payment | PKR 1,912,000 | 10% | Clearly labelled |
| 15% confirmation | PKR 2,868,000 | 15% | Clearly labelled |
| 42 monthly installments | PKR 414,267 × 42 = PKR 17,399,214 | Approximately 91% | Published monthly amount conflicts with the headline total |
| 20% completion | PKR 3,824,000 | 20% | Clearly labelled |
| Published total | PKR 26,003,214 | Approximately 136% | PKR 6,883,214 above the headline price |
Primary project source reviewed: Aureum Mall official payment-plan page ↗
Location & connectivity
Project material positions Aureum near Bahria Town Lahore with access to the Lahore Ring Road/Bahria Town interchange corridor. This supports connectivity toward Canal Road, Multan Road, Raiwind Road, Thokar Niaz Baig, Bahria Orchard and southern Lahore.
Planned facilities
- Residential apartments
- Retail and commercial shops
- Corporate offices
- Food court
- Parking and elevators
- Security and backup power
What must be verified
- Land title and relevant authority approvals
- Approved building plan and exact floor allocation
- Construction and possession schedule
- Escalation, utility and maintenance charges
- Transfer, cancellation and refund terms
- Exact unit number and net/gross area
Frequently asked questions.
Who is developing Aureum Mall & Residences?+
The current project brochure identifies AlFalah Real Estate & Builders as the developer.
Where is Aureum Mall located?+
The project is marketed at the Bahria Town Lahore side with direct connectivity to the Lahore Ring Road/Bahria Town interchange corridor.
What apartment types are available?+
The current brochure lists a 426 sq.ft. studio, 622–658 sq.ft. one-bed apartments and 1,103–1,491 sq.ft. two-bed apartments.
What is the apartment payment schedule?+
The brochure shows 10% down payment, 15% confirmation, 55 monthly installments and 20% on completion.
Are commercial shops available?+
Yes. The brochure lists commercial inventory with floor/category-dependent rates and a separate 42-month structure for second-floor commercial units.
Do the shop payment figures reconcile to 100%?+
Not all current shop examples on the project website can be reconciled from the published labels and amounts. FPN therefore does not present them as a complete payable schedule. Obtain a dated, signed unit statement that totals exactly 100% before paying.
How much of the published 172 sq.ft. shop schedule is clearly allocated?+
The labelled 10% down payment, 15% confirmation, 42 monthly installments at 1% each and 20% completion payment account for 87% of the PKR 77.40 Lakh total. The remaining 13% is not reliably allocated because the published half-yearly amount does not state a payment count.
Does the published 478 sq.ft. shop schedule total 100%?+
No. Using the official page labels, 10% down payment, 15% confirmation, 42 monthly payments of PKR 414,267 and 20% completion total PKR 26,003,214—approximately 136% of the PKR 19,120,000 headline price. Request a corrected, signed 100% statement before paying.
Is approval verified?+
Approval status should be verified directly from the relevant authority and developer documents before booking. FPN does not present marketing claims as legal approval evidence.
Ask for today’s availability before choosing a unit.
Share your budget and preferred category. FPN will provide the latest available inventory and written payment details.
Information on this page is based on project material, the payment-plan brochure and the official project website reviewed through 8 September 2026. Prices, inventory and delivery statements can change. Friends Property Network is not responsible for project delays, non-delivery, possession delays, escalation or developer-imposed charges, approval changes, investment losses or developer default. Verify approvals, ownership, construction progress and contractual terms independently before investing.