Latest1 Kanal House Construction Cost Lahore 2026: Area, Scope & BudgetLatestCDA Directs Sealing Action Against Bahria Town Head Office: What Is ConfirmedLatestCanton Sky Tower Lahore by OZ Developers: China Town, Prices & Payment PlanLatestAureum Mall Office Price 2026: 620 to 1,100 Sq Ft Cost ComparisonLatestBahria Sky 2 Shops Under 70 Lakh: September 2026 Payment ComparisonLatestGrand 15 One-Bed vs Two-Bed Apartment Cost 2026: Complete Cash FlowProjectCanton Sky Tower — From PKR 17,000/sq.ft.* • 30 monthly + 6 biannualProjectAureum Mall & Residences — From PKR 83 Lakh • 55 monthly plansProjectBahria Sky 2 — From PKR 17,000/sq.ft. • Installment planProjectBahria Sky 1 — Current inventory • FPN verificationRatesDHA Lahore property prices and buyer guideRatesLake City Lahore property prices and buyer guide
Friends Home • 1 Kanal Construction Guide

1 Kanal House Construction Cost Lahore 2026: Area, Scope & Budget

A 1 Kanal plot does not define a fixed construction bill. Friends Home models a 5,500 sq.ft. double-storey house, compares current market references and shows how a 500 sq.ft. design change affects the budget before furniture, land and external charges.

1 Kanal House Construction Cost Lahore 2026: Area, Scope & Budget
FPN editorial visual • Verified article
Verified figures

The 5,500 sq.ft. planning calculation

PKR; multiplication is exact. Land and separately quoted extras are excluded. Turnkey includes the grey stage: never add both totals together.

ScopeRate / covered sq.ft.Base total10% reserveTotal with reserve
Grey — lower case2,9501.6225 Crore16.225 Lakh1.78475 Crore
Grey — upper case3,3501.8425 Crore18.425 Lakh2.02675 Crore
Turnkey — lower case6,2003.41 Crore34.10 Lakh3.751 Crore
Turnkey — upper case7,5004.125 Crore41.25 Lakh4.5375 Crore
Verified figures

Why measuring the design matters

FPN sensitivity analysis using the same rate bands, before contingency and extras. None of these areas is a society entitlement.

Assumed covered areaGrey totalTurnkey total
5,000 sq.ft.PKR 1.475–1.675 CrorePKR 3.10–3.75 Crore
5,500 sq.ft. — main modelPKR 1.6225–1.8425 CrorePKR 3.41–4.125 Crore
6,000 sq.ft.PKR 1.77–2.01 CrorePKR 3.72–4.50 Crore
Verified figures

Write a scope matrix before requesting bids

This is an FPN tender checklist, not a claim that every contractor includes these items.

PackageRequire a written definitionKeep separate until priced
Grey structureFoundation, RCC, masonry, plaster, waterproofing and service rough-ins; quantities and testingDifficult soil, basement, retaining walls, dewatering
Turnkey / fixed finishesAll agreed grey works plus room-wise finish brands, wiring, sanitary, joinery and commissioningLoose furniture, appliances and specialist systems
FurnishedItem-by-item furniture, curtains, décor and appliance quantities with delivery and installationNo verified universal furnished rate; obtain vendor quotations
External and professionalBoundary/gate, paving, landscaping, design and supervision responsibilitiesSociety/authority fees, connections, taxes and margin unless expressly included
Buyer questions

Frequently asked questions.

Is 5,500 sq.ft. the compulsory covered area for a 1 Kanal house?+

No. It is FPN’s budgeting assumption for a double-storey house without a basement. Use the measured, approved design for your actual tender.

Should I add grey cost to the turnkey total?+

No. A complete turnkey figure already includes the structural stage. Adding both double-counts the grey work. Confirm that the contractor uses the same definition.

Does the guide provide a fully furnished quotation?+

No. The fixed-finish construction range excludes loose furniture and appliances. A furnished total requires a selected inventory and written quotations; FPN has not invented that missing allowance.

Is the 10% contingency a guaranteed maximum overrun?+

No. It is a planning reserve chosen for this example, not a guarantee. Keep known exclusions separate and obtain a larger risk allowance where the design or ground conditions require it.

01

Start with a measured house, not the plot label

The model assumes two storeys, 5,500 sq.ft. of total covered construction and no basement. It is useful for an owner comparing designs in Lahore, including Bahria Town and Bahria Orchard, but is not a statement of either society’s permitted floor area. Ask your architect to identify enclosed floors, stairs, mumty, terraces, voids and projections on a measurement sheet. Then have every bidder use that same sheet. An attractive per-square-foot rate is meaningless if contractors measure different areas.

  • Confirm the plot dimensions and current building requirements for the exact block.
  • Attach a floor-by-floor area statement to the tender.
  • Record whether boundary walls, gate, roof work and external paving are measured separately.
02

A 500 sq.ft. decision has a visible price

Using the model above, an additional 500 sq.ft. adds PKR 14.75–16.75 Lakh to grey construction or PKR 31–37.50 Lakh to turnkey construction before reserve. This is arithmetic, not a promise that every extension costs the same: a change may also affect foundations, stairs, façade and services. Compare a larger house against the space your household will actually use, and freeze the design before ordering materials. A smaller approved layout can be a clearer budget decision than negotiating an undefined discount.

03

Read the lower calculator benchmark without mixing scopes

Zameen’s displayed result is a separate benchmark, not the price of FPN’s assumed design. Its rounded total and rate should not be reverse-engineered into a supposedly exact covered area. Ask for its selected area, room counts and component assumptions before comparing it with a contractor’s package. The price difference is a reason to reconcile quantities and specification, not evidence that one contractor is overcharging. Do not average unlike estimates into a misleading “market rate”.

04

Turnkey is not automatically furnished

Use three budget envelopes: fixed construction, movable furnishing and owner-paid external costs. For furnishing, count each bed, sofa, dining set, curtain, appliance and other chosen item, then add delivery and installation from written offers. The defensible furnished total is the selected turnkey amount plus those priced items and any outstanding external costs. No single numeric furnished total is published here because no selected furnishing schedule has been verified. If a seller advertises “fully furnished”, insist on an inventory annexure rather than relying on that phrase.

05

Known exclusions must not disappear into contingency

The example excludes land, basement, soil remediation, design and approval fees, utility connections, solar, central HVAC, lift, landscaping, furniture, appliances and separately payable taxes. Specify contractor overhead, supervision, wastage and profit in the quotation: if included, do not add a second margin; if excluded, price it before comparing bids. Obtain a soil report and engineer’s advice before treating foundation quantities as fixed. Imported brands, long spans, double-height spaces and complex elevations need their own measured allowances.

  • Solar: separate equipment capacity, battery, installation and warranty.
  • HVAC: define room coverage, electrical loads and commissioning.
  • Utilities: obtain current connection and society requirements, not an old fee screenshot.
  • Basement: price excavation, structure, drainage and waterproofing as a separate design package.
06

Keep payment exposure smaller than unfinished obligations

Ask for a work programme that links payments to inspected quantities and completed milestones. Avoid a payment calendar that advances simply because a month has elapsed. Agree how stored materials are identified, protected and credited; how variations are approved before work; and who carries price escalation. An independent technical inspection is especially useful before concealed services are covered. These are practical procurement checks, not a substitute for a professionally reviewed construction contract.

07

Documents to assemble before signing

Create a single tender folder and issue the same version to each bidder. A comparison is only useful when all bidders price the same responsibilities. Mark every unanswered item as an open cost, not zero.

  • Plot ownership/possession documents and exact site identification.
  • Applicable approved drawings, structural design and soil investigation.
  • Measured BOQ, brand schedule and room-by-room finish allowances.
  • Contractor identity, independently checked completed work and references.
  • Written exclusions, tax/margin treatment, escalation and variation process.
  • Inspection milestones, payment certification, retention, defects and handover terms.
  • For completion: as-built service drawings, test records, warranties and final account.
08

Use this as a planning model, then replace it with evidence

Friends Home’s comparison helps you ask better questions; it does not reserve a contractor, certify a design or quote a finished house. Obtain comparable current bids and independent architectural, structural and contractual advice before committing funds. Send your measured drawings and scope to Friends Property Network on WhatsApp 0322-4222522 for help organizing the comparison. FPN does not guarantee final construction costs, contractor performance or completion dates.

Verification note

Checked 10 September 2026. Avenir publishes Lahore grey rates of PKR 2,950–3,350 and A-grade turnkey rates of PKR 6,200–7,500 per covered sq.ft. Its calculator labels the model August 2026. Zameen’s separate 1 Kanal Lahore calculator, dated 9 September 2026, displays PKR 2.82 Crore and PKR 4,471/sq.ft. These independent references do not agree on a common specification: neither validates the other’s final price. FPN’s 5,500 sq.ft. area and 10% reserve are explicit planning assumptions, not source quotations or approved drawings. No fresh supplier quotation or furnished-package price was obtained. Information may change after publication; always obtain the latest official document before acting.

Important notice

Friends Property Network is not responsible for project delays, non-delivery, possession delays, escalation or developer-imposed charges, approval changes, investment loss or developer default. Conduct independent legal, financial and technical due diligence before investing.