LatestCDA Layout Plan Display Rules 2026: QR Codes, Allotment Vetting & Buyer ChecksLatestCanton Sky Tower 266 Sq Ft Ground-Floor Shop: Complete Cost & Cash FlowLatestCDA Show-Cause Notices for Yaar Muhammad Scheme & Galaxy Enclave: Buyer AlertLatestGrand 15 Location Guide: Downtown Bahria Town Access & Buyer ChecksLatestSBP Housing Finance Rules 2026: 90% LTV, 30-Year Tenor & Buyer ChecksLatestAureum Mall Studio vs 1-Bed Apartment: Complete Cost Comparison 2026ProjectCanton Sky Tower — From PKR 17,000/sq.ft.* • 30 monthly + 6 biannualProjectAureum Mall & Residences — From PKR 83 Lakh • 55 monthly plansProjectBahria Sky 2 — From PKR 17,000/sq.ft. • Installment planProjectBahria Sky 1 — Current inventory • FPN verificationRatesDHA Lahore property prices and buyer guideRatesLake City Lahore property prices and buyer guide
Canton Sky Tower • Shop Cost Guide

Canton Sky Tower 266 Sq Ft Ground-Floor Shop: Complete Cost & Cash Flow

FPN reconciles a 266 sq ft standard ground-floor shop example from the developer-supplied Canton Sky Tower schedule. The PKR 1.596 Crore price, PKR 47.88 Lakh down payment and every reported instalment add back to 100%—but availability, approvals and charges still require fresh written verification.

Canton Sky Tower 266 Sq Ft Ground-Floor Shop: Complete Cost & Cash Flow
FPN editorial visual • Verified article
Verified figures

266 sq ft ground-floor shop: complete 100% arithmetic

The supplied schedule applies PKR 60,000 per sq ft to the 266 sq ft gross area. Figures below are exact transcriptions and calculations for this example—not a claim that the unit is currently available.

Payment componentCalculationAmountShare of total
Headline price266 sq ft × PKR 60,000PKR 1.596 Crore100%
Down payment30% × PKR 1.596 CrorePKR 47.88 Lakh30%
Monthly instalments30 × PKR 1.596 LakhPKR 47.88 Lakh total30%
Biannual instalments6 × PKR 7.98 LakhPKR 47.88 Lakh total30%
Possession balance10% × PKR 1.596 CrorePKR 15.96 Lakh10%
Reconciled total30% + 30% + 30% + 10%PKR 1.596 Crore100%
Verified figures

What the headline price does—and does not—establish

A unit schedule is a commercial offer, not title, approval or delivery evidence. Ask the legal seller for written answers to every item below.

ItemWhat this example showsWhat must still be confirmed
Area190 sq ft net; 266 sq ft grossSigned floor plan, common-area allocation and measurement method
Base ratePKR 60,000 per gross sq ftDated rate validity and whether any negotiated discount changes the schedule
Category premiumZero in this unit exampleCorner, atrium, boulevard or other premiums for the chosen unit
InstalmentsReported amounts reconcile to 100%Exact due dates, grace period, late charges and default/cancellation terms
Other costsNot included in the shown PKR 1.596 CroreTaxes, documentation, transfer, utility, maintenance, possession and fit-out charges
Buyer questions

Frequently asked questions.

What is the price of the 266 sq ft Canton Sky Tower shop example?+

At PKR 60,000 per gross sq ft, the supplied schedule calculates PKR 15,960,000, or PKR 1.596 Crore, before any taxes or additional charges not shown in the unit sheet.

How much is the 30% down payment?+

The exact 30% down payment in this example is PKR 4,788,000, or PKR 47.88 Lakh.

What is the monthly instalment?+

The reported plan lists thirty monthly instalments of PKR 159,600 each, equal to PKR 47.88 Lakh or 30% in total.

How much is each biannual instalment?+

Each of the six reported biannual instalments is PKR 798,000, or PKR 7.98 Lakh. Together they equal 30% of the headline price.

Is this shop currently available and LDA approved?+

This article does not claim current availability or approval. Ask FPN for a fresh seller-issued unit statement and verify the project-specific LDA approval/NOC reference, sanctioned plan and title documents directly before payment.

01

Why this exact unit example is useful

Broad per-square-foot claims can hide the cash a buyer must actually arrange. This example converts one standard 266 sq ft ground-floor schedule into exact Rupee obligations and shows the difference between gross and net area. It is a planning case study, not an availability advertisement.

02

How PKR 1.596 Crore is calculated

The developer-supplied schedule identifies 190 sq ft net area and 266 sq ft gross area. Its PKR 60,000 rate is applied to the gross area: 266 multiplied by PKR 60,000 equals PKR 15,960,000. The unit is marked standard with no category premium in the supplied row.

03

Cash-flow pressure buyers should plan for

The monthly amount is only one part of the obligation. A buyer must also retain enough cash for each PKR 7.98 Lakh biannual payment, the PKR 15.96 Lakh possession balance and every tax or charge omitted from the sheet. Request a calendar with actual due dates before judging affordability.

  • Initial 30% commitment: PKR 47.88 Lakh
  • Thirty monthly payments: PKR 1.596 Lakh each
  • Six biannual payments: PKR 7.98 Lakh each
  • Possession balance: PKR 15.96 Lakh
  • Keep a separate contingency for taxes, transfer, utilities, maintenance and fit-out
04

Approval and contract checks before a token

OZ Developers' public project page currently confirms the project name and developer association but does not publish the project-specific approval reference, sanctioned G+7 plan or unit contract. A launch image and payment sheet cannot replace primary legal evidence.

  • Obtain the project-specific LDA approval/NOC reference and verify it with LDA
  • Match plot title, land use, height, floor count, parking and fire-safety approvals
  • Check the legal seller, receiving account and authority to sell the exact unit
  • Read possession, delay, escalation, cancellation, refund and transfer clauses
  • Do not rely on a rent, opening-date or appreciation promise unless enforceable in writing
05

How to request a comparable current quotation

Ask for a dated statement showing unit number, floor, net and gross area, rate, category premium, total price, every instalment, taxes and additional charges. Compare the signed total with FPN's live Canton inventory page and recalculate every component to 100% before paying.

Verification note

Prepared on 24 August 2026. OZ Developers' official Canton Sky Tower page confirms the project and developer association but currently labels the project 'Coming Soon' and does not publish unit-level prices or a sanctioned plan. The financial example is transcribed from the developer-supplied Canton Sky Tower floor schedule held by FPN: unit reference G-06, standard category, 190 sq ft net area, 266 sq ft gross area, PKR 60,000 per gross sq ft, no category premium in that schedule, and a PKR 15,960,000 total. FPN independently reconciled the reported 30% down payment, thirty monthly instalments, six biannual instalments and 10% possession balance to 100%. This calculation does not prove current availability, regulatory approval, construction delivery or the absence of taxes and other charges; obtain a fresh signed unit statement and primary legal documents before payment. Information may change after publication; always obtain the latest official document before acting.

Important notice

Friends Property Network is not responsible for project delays, non-delivery, possession delays, escalation or developer-imposed charges, approval changes, investment loss or developer default. Conduct independent legal, financial and technical due diligence before investing.

Live visitors
WhatsAppChat with FPN